IMPROVEMENT OF AL SAFRIYYA PALACE AVENUE
Project scope includes re-construction / realigning the existing Al Safiriyya Palace Avenue (single lane dual carriage way) between Zallaq Highway and Zaid Bin Omera Highway with new traffic signalized Junction with Road R3841. Total length of the Project is 3.295 Km.
The works involves re-construction / re alignment of existing pavement with capillary layer, storm water drainage system, Soft landscaping with Irrigation system, footpath etc